How much does planning permission cost?

The council fee is usually the smallest part of the bill. Here is what each application type costs, and where the real money goes.

3 min read  ·  England  ·  Updated 22 July 2026

Householder fees

Application typeFee
Householder planning application£258
Listed building consentFree
Lawful development certificate, proposed£130
Lawful development certificate, existing£258
Prior approval, larger home extension£120
Works to trees in a conservation areaFree
Tree Preservation Order consentFree
Non material amendment£43
Discharge of conditions, householder£43 per condition

These are the England figures. Fees are set by regulations and are updated periodically, so confirm the current amount on the Planning Portal or with your council before you apply.

Larger projects

Application typeFee
New dwelling, full application£578 per dwelling, up to 50 dwellings
Change of use to a dwelling£578
Advertisement consent£165
Removal or variation of a condition£258

Ways to pay less

What actually costs the money

The council fee is rarely the main expense. For a typical householder extension the realistic total looks more like this.

The most expensive outcome is designing a scheme, paying for drawings and then discovering a constraint that makes it unviable. Checking the constraints on your address first costs nothing and takes about a minute.

How long decisions take

A householder application is normally determined within eight weeks. Prior approval under the larger home extension scheme runs to a 42 day period. Larger or more complex applications run to 13 weeks. Councils can and do ask for an extension of time, and validation delays at the start are common if drawings are incomplete.

Build the timeline into your plans. Between design, application and building regulations, a straightforward extension is realistically a three to six month process before anyone digs.

Find out which application you actually need

casaQ checks your address and project and tells you the likely route, so you are not paying for the wrong application.

Check your address free

Common questions

Is there a fee for listed building consent?

No. Listed building consent applications are free. You will still pay for the supporting documents, which usually include a heritage statement and measured drawings.

What is the free go rule?

If your application is refused or you withdraw it, you can make one further application for the same site with a similar description within 12 months without paying another fee.

Do I pay a fee for permitted development?

No, because there is no application. If you want written confirmation that your project is permitted development, a certificate of lawful proposed development costs £130.

Is building regulations approval included in the planning fee?

No. They are separate systems with separate applications and separate fees. Most extensions and loft conversions need both.

What happens to my fee if I am refused?

The fee is not refunded. You can appeal to the Planning Inspectorate, which is free for householder appeals, or use the free go rule to submit a revised scheme.